Poultry house project in Khmelnytskyi region.

Пташник

Project Data

Broiler poultry houses measuring 26 × 114 m, with a capacity of 27,000 birds each.
The biomass boiler house supplies a heat carrier at 80/60°C.

Installed Equipment

Water-based air heaters RMX-64ACO – 10 units.

Engineering Solution

Heat-loss calculations showed a maximum heat demand of 740 kW at an indoor temperature of +20°C and outdoor design temperature of –22°C.
Standard equipment was not optimal from a technological standpoint, though financially acceptable, so special heaters with a four-row heat exchanger were engineered specifically for this project.
This allowed us to increase heating capacity without exceeding the budget.

Ten RMX-64ACO heaters were installed, each with a heating output of 70 kW (at +20°C indoors, water 80/60°C), and an airflow capacity of 7,200 m³/h.
The heaters were installed along the walls under the inlet flaps.
Mounting was carried out using brackets with dual rotating frames, allowing the heaters to rotate 180° during operation and switch to a service position during sanitation.

Cleaning is carried out using high-pressure water jets.
To facilitate maintenance, the latches are opened and the fan housing is swung away on hinges from the heat exchanger, providing full access to all components.

Implementation period: 2020

Result